{"id":314,"date":"2021-11-28T07:08:18","date_gmt":"2021-11-28T07:08:18","guid":{"rendered":"https:\/\/structureauditagency.com\/?p=314"},"modified":"2021-11-28T07:08:20","modified_gmt":"2021-11-28T07:08:20","slug":"pull-out-capo-test-for-structure-audit-of-concrete-grade","status":"publish","type":"post","link":"https:\/\/structureauditagency.com\/?p=314","title":{"rendered":"PULL OUT\/CAPO TEST FOR STRUCTURE AUDIT OF CONCRETE GRADE"},"content":{"rendered":"\n<p class=\"has-text-align-center\"><strong><u>PULL OUT\/CAPO TEST<\/u><\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong>FOR<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong><u>DETERMINING THE IN-SITU<\/u><\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong><u> <\/u>GRADE OF CONCRETE<\/strong><\/p>\n\n\n\n<p><strong><u>PROJECT <\/u>NAME\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 : <\/strong>ANALYSIS THE LOAD CAPACITY OF THE STRUCTURE AND TO RETROFIT IT AS PER LATEST CODE FOR NEXT 10 YEARS LIFE. \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/p>\n\n\n\n<p><strong><u>PROJECT LO<\/u>CATION\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/strong>: IOCL, HALDIA, WEST BENGAL<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"765\" src=\"https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-20-at-7.24.22-AM-1024x765.jpeg\" alt=\"\" class=\"wp-image-319\" srcset=\"https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-20-at-7.24.22-AM-1024x765.jpeg 1024w, https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-20-at-7.24.22-AM-300x224.jpeg 300w, https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-20-at-7.24.22-AM-768x574.jpeg 768w, https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-20-at-7.24.22-AM-1536x1148.jpeg 1536w, https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-20-at-7.24.22-AM.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong><u>STRUCTURAL CONSULTANTS<\/u><\/strong><\/p>\n\n\n\n<p><strong>O.B DEVELOPERS<\/strong><\/p>\n\n\n\n<p>(STRUCTURE AUDIT AGENCY)<\/p>\n\n\n\n<p>F-14, Kalkaji Main Road<\/p>\n\n\n\n<p>New Delhi-110019<\/p>\n\n\n\n<p>MOB: +91-9717924616<\/p>\n\n\n\n<p><a href=\"mailto:structureauditagency@gmail.com\">structureauditagency@gmail.com<\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/structureauditagency.com\">wwwstructureauditagency.com<\/a><\/p>\n\n\n\n<ol class=\"wp-block-list\" type=\"1\"><li><strong><u>INTRODUCTION<\/u><\/strong><\/li><\/ol>\n\n\n\n<p>The structure is a located at Haldia, West Bengal. After going through various method of repair from local consultant the organisation decided to hire a professional audit firm for analysis and retrofitting. M\/s O.B Developers (Structure Audit Agency) was requested to check the maximum load carrying capacity of the floor and to make the building fit for next 10 years by retrofitting as per latest code.<\/p>\n\n\n\n<p>.<\/p>\n\n\n\n<p><strong><u>1.2 Process of Plate Load Testing<\/u><\/strong><\/p>\n\n\n\n<p>1.2.1 Test location:- Location is selected , usually in the middle of the reinforcement mess (50 mm from reinforcement) and is to be minimum 100mm from any edge and corners . If more than one test is required in the same area, test is placed in the same horizontal layer with an internal distance of minimum 200mm, maximum 300 mm.<\/p>\n\n\n\n<p>1.2.2 Coring the centre hole, planning the surface and routing the recess:- using a water cooled diamond bit, an 18mm diameter\u00a0 by 60mm deep hole is drilled perpendicular to plane concrete surface. A recess (slot) is routed in the hole to a diameter of 25 mm and at a depth of 25 mm with a diamond tool. A split ring is expanded in the recess and pulled out using a pull machine reacting against a 55 mm diameter counter pressure ring. The concrete in the strut between the expanded ring and the counter pressure ring is in compression.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"408\" height=\"339\" src=\"https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/1.jpg\" alt=\"\" class=\"wp-image-315\" srcset=\"https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/1.jpg 408w, https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/1-300x249.jpg 300w\" sizes=\"auto, (max-width: 408px) 100vw, 408px\" \/><\/figure>\n\n\n\n<p>1.2.3 Expansion of capo- insert:- Hold the pull bolt of the expansion unit in the\u00a0 same position\u00a0 with the\u00a0 12\u201d wrench and turn the big nut clockwise with the 46mm wrench, about 9 rotation. When the expansion of the Capo-Insert has been completed,\u00a0\u00a0 the thread of the base\u00a0 pull bolt will emerge\u00a0 and a hard resistance will be felt. Then, back off the nut 1\/8 rotation anti-clockwise. Still with the base pull bolt kept in the same position with the adjustable wrench.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"409\" height=\"449\" src=\"https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/2.jpg\" alt=\"\" class=\"wp-image-316\" srcset=\"https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/2.jpg 409w, https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/2-273x300.jpg 273w, https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/2-300x329.jpg 300w\" sizes=\"auto, (max-width: 409px) 100vw, 409px\" \/><\/figure>\n\n\n\n<p>1.2.4 Attachment of the counter pressure and the coupling:-The counter pressure is place around the expansion unit with its plane face resting against the concrete surface. Then thread the coupling on the base pull bolt 2-3\u00a0\u00a0 rotations.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"415\" height=\"423\" src=\"https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/3.jpg\" alt=\"\" class=\"wp-image-317\" srcset=\"https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/3.jpg 415w, https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/3-294x300.jpg 294w, https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/3-300x306.jpg 300w\" sizes=\"auto, (max-width: 415px) 100vw, 415px\" \/><\/figure>\n\n\n\n<p>1.2.5 Coupling of the hydraulic pull machine:-Make sure the recess of the counter pressure catches the 55 mm in diameter&nbsp; instrument&nbsp; front hole and make it ready to be loaded<\/p>\n\n\n\n<p>1.2.6 Pull out:- Hold one hand on the pistol handle between the two cylinders of the pull machine. Loading is commenced by turning the loading handle (use the outer handle knob) clock-wise at a speed of about one rotation per two seconds, constantly all the time, until rupture occurs.\u00a0 The digital display will indicate the pull force in kN (kilo Newton).\u00a0 Before the\u00a0\u00a0 peak-load occurs, the kN-loading rate will decrease.\u00a0\u00a0 Keep on turning the handle with one rotation every two seconds.\u00a0 After the peak-load has\u00a0\u00a0 been\u00a0\u00a0 reached, the handle is turned\u00a0\u00a0 quickly clock-wise\u00a0\u00a0 until no more travel is left on the telescope handle.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"413\" height=\"471\" src=\"https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/4.jpg\" alt=\"\" class=\"wp-image-318\" srcset=\"https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/4.jpg 413w, https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/4-263x300.jpg 263w, https:\/\/structureauditagency.com\/wp-content\/uploads\/2021\/11\/4-300x342.jpg 300w\" sizes=\"auto, (max-width: 413px) 100vw, 413px\" \/><\/figure>\n\n\n\n<p>1.2.7 Transforming the pullout load to compressive strength&#8211;<\/p>\n\n\n\n<p>Then pull out force (Fu) is measured in kN and transformed to compressive strength (Fck) in MPa (or Psi) with the help of calibration chart.<\/p>\n\n\n\n<p>Reference<\/p>\n\n\n\n<p>\u2022&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ASTM C-900-87<\/p>\n\n\n\n<p>\u2022&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; BS 1881<\/p>\n\n\n\n<p>\u2022&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; DS 423.<\/p>\n\n\n\n<p>\u2022&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; AS3850<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PULL OUT\/CAPO TEST FOR DETERMINING THE IN-SITU GRADE OF CONCRETE PROJECT NAME\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 : ANALYSIS THE LOAD CAPACITY OF THE STRUCTURE AND TO RETROFIT IT AS PER LATEST CODE FOR NEXT 10 YEARS LIFE. \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 PROJECT LOCATION\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 : IOCL, HALDIA, WEST BENGAL STRUCTURAL CONSULTANTS O.B DEVELOPERS (STRUCTURE AUDIT AGENCY) F-14, Kalkaji Main Road New Delhi-110019 MOB: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-314","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/structureauditagency.com\/index.php?rest_route=\/wp\/v2\/posts\/314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/structureauditagency.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/structureauditagency.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/structureauditagency.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/structureauditagency.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=314"}],"version-history":[{"count":1,"href":"https:\/\/structureauditagency.com\/index.php?rest_route=\/wp\/v2\/posts\/314\/revisions"}],"predecessor-version":[{"id":320,"href":"https:\/\/structureauditagency.com\/index.php?rest_route=\/wp\/v2\/posts\/314\/revisions\/320"}],"wp:attachment":[{"href":"https:\/\/structureauditagency.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=314"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/structureauditagency.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=314"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/structureauditagency.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}